Lean isn’t just for manufacturing facilities! A post-secondary institution that was in need of improvement to their processes in its high density library also utilized Lean methods to improve their operations.…
Category: Case Studies
Steel fabrication facility increased production by 50% in six months
A local structural steel fabrication company wanted to increase production in their welding shop. This company solicited the help of an outside (consulting) Lean Expert for over six months to initiate Lean…
How Lead Time Was Reduced By 80%
Before Lean, an Oil and Gas Engineering Firm took an average of seven months to see a project through to completion. Their project lead time was 213 days … they would agree that…